Home | Contact Us | Sitemap
 Services| Portfolio| Clients| Careers| Locations| Newsroom| Technology| About Us
Precast

New Auburn Aren
Auburn, Alabama

TRC is providing precast concrete engineering services for the stadium seats and walls at event level for the new multi-purpose arena located in Auburn, Alabama. The New Auburn Arena will accommodate 9,600 seats. The new arena will be the home of the Auburn University Tigers basketball teams. Projected construction cost for the facility is $92.5 million. It will contain two practice courts, a weight room, and twelve suites.

 
Key Structural Components
Connections
Product Designs
Erection Drawings
 
Design Team
Client: Metromont Corporation
Architect: 360 Architecture, Inc.
Contractor: BL Harbart International
Structural Engineers: Walter P. Moore
Precast Engineers: TRC Worldwide Engineering, Inc.
New Construction: 243,792 GSF
Construction Cost: $92.5 million
 







 
All Rights Reserved. © 2010 TRC