• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
image
  • DESIGN TEAM:
  • ArchitectThe Estopinal Group
  • Structural EngineerTRC Worldwide Engineering
  • New Construction194,056 GSF
  • Construction Cost$32 Million
  • SHARE

Charlestown High School - Charlestown, Indiana

TRC Worldwide Engineering, Inc. will provide structural engineering services for the new construction project phases at Charlestown High School in Charlestown, Indiana. This latest development at the facility includes a two-story class room wings and 117 feet clear span multi-purpose gymnasium with deep long span steel joists and girders. The structures total 195,056 square feet.

Key Structural Components:
  • Composite floor slabs on metal deck
  • Steel beams and columns
  • Shallow spread footings for foundations, combination of CUM and steel frame for lateral load resistance
BACK TO PORTFOLIO