• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
image
  • DESIGN TEAM:
  • OwnerBall Chatham School Dist.
  • Floor Area165,000 GSF overall / 105,000 GSF Athletic Facility
  • Structural EngineerTRC Worldwide Engineering
  • Construction Cost$28 Million
  • SHARE

Glenwood High School - Chatham, Illinois

Complete engineering design and construction period services was provided for this High School complex housing 1500 students by TRCWW. The complex included a 450 seat theater/auditorium, two competition size gymnasiums, fully equipped kitchen and cafeteria, High Tech classrooms, labs studios and administrative offices. Athletic facilities included fully lit baseball and football stadiums and tennis courts.

Systems designed included a central boiler and chiller plant, energy efficient air handling and distribution systems, state of the art lighting systems, life safety systems, power distribution, data, voice, video systems throughout and building automation system.

BACK TO PORTFOLIO