• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
image
  • DESIGN TEAM:
  • ArchitectThe Estopinal Group
  • ContractorGarmong/Pepper Construction
  • Structural EngineerTRC Worldwide Engineering
  • New Construction580,000 SF
  • Construction Cost$158,000,000
  • SHARE

Union Replacement Hospital - Terre Haute, Indiana


BACK TO PORTFOLIO