• 615.661.7979
  • 217 Ward Circle, Brentwood, Tennessee 37027
bank-of-america
  • DESIGN TEAM:
  • Client/Contractor Benderson Development
  • Architect ADP Group
  • Parking Consultant/Structural Engineers TRCWW
  • New Construction 118,000 GSF
  • Estimated Construction Cost $3.75 million

Bank of America Parking Garage - Sarasota, Florida

TRC Worldwide Engineering, Inc. provided structural engineering services and parking layouts for this 118,000 GSF, 2-bay parking deck in a tight urban setting, required for a redeveloped mixed-use tower and existing bank location. Ground level incorporates heavy truck traffic through the length of one bay requiring a higher than normal first elevated level. Utilization of transitioning speed ramps exterior to, and within the foot print of deck, created parking zones near critical office lobby entrance.

Key Structural Components
  • 16'-10" first elevated level
  • 251 spaces
  • 2 stair tower, 1 elevator tower
  • Precast construction

BACK TO PARKING STRUCTURES