This 620 space parking structure consists of 5 levels above grade and is located adjacent to an existing office complex. A pre-cast concrete structure, this facility provides employee parking. This design-build project covers over 215,000 square feet utilizing a 3-bay structure and with the use of pre-cast materials, was constructed in less than 90 days.