This three level, 469 space, structure was designed and built in six months to meet critical parking needs as a result of the new hospital addition. This facility is for visitor parking on the ground level and staff parking on the upper two levels. Pre-cast concrete was used for the structure and painted with a sand textured paint to match the adjacent facilities.