new-auburn
  • DESIGN TEAM:
  • Client Metromont Corporation
  • Architect 360 Architecture, Inc.
  • Contractor BL Harbart International
  • Structural Engineers Walter P. Moore
  • Precast Engineers TRC Worldwide Engineering
  • New Construction 243,792 GSF
  • Construction Cost $92.5 million

New Auburn Aren - Auburn, Alabama

TRC provided precast concrete engineering services for the stadium seats and walls at event level for the new multi-purpose arena located in Auburn, Alabama. The New Auburn Arena will accommodate 9,600 seats. The new arena will be the home of the Auburn University Tigers basketball teams. Projected construction cost for the facility is $92.5 million. It will contain two practice courts, a weight room, and twelve suites.

Key Structural Components
  • Connections
  • Product Designs
  • Erection Drawings