  • DESIGN TEAM:
  • Developer Morin Development
  • Architect Collman & Karsky Architects, Inc.
  • Structural EngineerJenkins & Charland/TRC Worldwide Engineering
  • Contractor Hardin Construction
  • New Construction 550,000 GSF / Building: 345,000 GSF / Garage: 205,000 GSF
  • Construction Cost $47 Million

Tampa West End Apartments - Tampa, Florida

Jenkins & Charland/TRC Worldwide Engineering, Inc. provided structural engineering design and contract administration on this six- and eight-story apartment complex that will wrap around three sides of a 5-level, 555-space parking garage. Ground level retail space will occupy a small portion of the complex. A fully landscaped amenities deck above the garage area will include a pool and clubhouse.

Key Structural Components
  • Post tension, concrete flat slabs
  • Concrete columns and shear walls
  • Pre-cast concrete exterior skin
  • Pile foundation system