The Precast/Prestressed Concrete Institute's Ascent (Summer 2008) magazine highlights the Duke Energy Center's use of precast concrete double tees in floor framing.
The 52-story Wachovia Corporate Center will be a new, mixed-use cultural arts facility in Charlotte, N.C. Features include a 42-story condominium tower, art museums and a 1200-seat performing arts theater.
A collaboration between TRC and The Estopinal Group architects provides an innovative solution to a critical vertical expansion.